5014313AB | 1999-2004 Chrysler 300M Concorde Dodge Intrepid Oil Cooler Pressure Control Valve Line
Price list
Still could not find the Part? Contact us @ Find Exact Part in 24 Hours
Specification
Brand | |
---|---|
MPN | 5014313AB |
Year | 1999, 2000, 2001, 2002, 2003, 2004 |
Make | |
Model | 300M, Concorde, Intrepid |
Trim | Sedan 4-door |
Engine | 3.2L 3200CC 197Cu. In. V6 GAS SOHC Naturally Aspirated, 3.5L 3497CC 215Cu. In. V6 GAS SOHC Naturally Aspirated, 3.2L 3228CC 197Cu. In. V6 GAS SOHC Naturally Aspirated, 3.2L 3231CC 197Cu. In. V6 GAS SOHC Naturally Aspirated, 3.5L 3518CC 215Cu. In. V6 GAS SOHC Naturally Aspirated |
Placement On Vehicle | Front |
Fitment Type | Direct Replacement |
OE Spec or Performance/Custom | OE Spec |
Warranty | 1 Year |
Part Number | 5014313AB, 05014313AB |
Condition | New |
Fit In Five Steps
How to replace a Chrysler 300M Oil Cooler Pressure Control Valve?
1.Disconnect Battery
Disconnect the battery. Remove the negative terminal with a socket set and wrench first, then remove the positive cable. Standing over the engine bay, remove the dipstick from the transmission. Slide under the vehicle with your tools.
2.Place Oil Pan & Unscrew Bolts
Place the oil pan under the transmission. Unscrew the fluid plug on the bottom of the transmission to drain the oil into the pan. Pull the oil pan from the bottom of the transmission. This requires you remove 20 bolts or so with a socket wrench. Put the bolts in the oil pan so you do not sully them with dirt by laying them on the ground. The transmission fluid will keep them lubricated and clean. Peel the gasket off the rim of the transmission fluid pan or the rim of the transmission; it sticks to one or the other.
3.Remove Old Pressure Control Solenoid Valve
Unthread the bolts or screws on the fixing plate and remove it. Look in the vehicle owner’s manual for the transmission parts diagram. Identify the PCS. Pull the two wires off the PCS and pull it off the fixing plate. The PCS is fastened to the fixing plate with tabs that you must depress before pulling it off, or with small screws, you must first unthread.
4.Install New Pressure Control Solenoid Valve
Affix the new PCS and hook up the two wires on the proper terminal tabs. Screw the fixing plate back in position. Run transmission fluid on the new gasket and put it around the rim of the oil pan.
5.Replace all Removal Parts & Check For Leaks
Put the oil pan in position under the transmission and bolt it into place. Refill the transmission with fluid. The owner’s manual specifies the proper amount.
BUY HERE
$203.23
Got something to discuss?